J/B Shirine has placed more than 80 flexpipes on sea bed at Horns Rev II. The flexpipes are connected to the foundations and cables are pulled through connecting the foundations (and later the turbines) to the transformerstation.
J/B Shirine will be towed to Antwerp as soon as weather clears.