16.05.08 - loading of Sea Jack


First monopiles and transision pieces (TP) loaded onto Sea Jack.

T/B Smit Barracuda and barge moored along side Sea Jack with the monopiles and TP's. 

Loading from was performed from barge to Sea Jack in co-operation with Esdan-Stevedoring, ABJV and A2Sea.

Sea Jack will load 4 monopiles and 4 transision pieces each port call.

First foundation was succesfully placed at position at Horns Rev 19.05.08.




 Page 1 of 1. Showing 1 - 20 of 20 images.