Below is pictures of the Siemens SWP 2.3-93 turbines units used for Horns Rev II. Once installed at Horns Rev the hight of the turbines (counting from blade tip) will be 114,5 mtr above water level (+30-40 mtr below). The diameter is 93 mtrs. Today on the 26 August 2009 76 turbines are installed at Horns Rev II.